HRGM Parks and Playgrounds Portfolio
Click on the pictures for a description of the project
Leckie ES Outdoor Classroom
Leckie ES Outdoor Classroom

Description Coming Soon!

CW Harris ES 5-12 Year Old Playgroun
CW Harris ES 5-12 Year Old Playgroun

HRGM was contracted to renovate the playgrounds at CW Harris Elementary School. We demolished the existing play areas and re-graded the land to create an ADA accessible play space. We also installed a new Storm Water Management system. We installed poured in place safety surfacing and artificial turf as well as a new ADA ramp and extensive retaining wall. We also installed a solid wrought iron fence with panic bars and added metal fence screens along with 20K SF of sod.

CW Harris ES 2-5 year old Playground
CW Harris ES 2-5 year old Playground

HRGM was contracted to renovate the playgrounds at CW Harris Elementary School. We demolished the existing play areas and re-graded the land to create an ADA accessible play space. We also installed a new Storm Water Management system. We installed poured in place safety surfacing and artificial turf as well as a new ADA ramp and extensive retaining wall. We also installed a solid wrought iron fence with panic bars and added metal fence screens along with 20K SF of sod.

Miner Elementary School Playground
Miner Elementary School Playground

HRGM was contracted to renovate the 5-12 year old playground area at Miner ES which was destroyed in a fire. We installed a new surface in the form of Engineered Wood Fiber and repaired the play equipment. We then stripped the area between the 2 existing play areas and graded it to prepare for a new play area. We installed new 5-12 year old play equipment and poured in place safety surfacing. We also resurfaced the existing tot lot and installed over 3,000 SF of sod.

King Greenleaf Rec. Ctr. Playground
King Greenleaf Rec. Ctr. Playground

HRGM Corporation was contracted as the Design-Builder of King Greenleaf's playground. We demolished the existing playground and re-graded the land and installed a new Storm-Water Management System. We built a small berm and installed concrete foorters and new fence posts and fencing. We installed custom play equipment for the tot lot and the school age play area and designed a custom leaf shaped pavilion with its own concrete pad. In addition to landscaping, we installed a new remote splash pad.

Banneker Recreation Center Pool
Banneker Recreation Center Pool

HRGM was contracted to perform the pool resurfacing and deck restoration at Banneker Recreation Center. We drained both the main and wading pools. Sandblasted the pools removing all dirt and debris and pressure tested all of the lines in both pools. We installed new land and target tiles flush with new coatings. We installed new bond coat and tiled the top of each set of stairs. We painted the existing main pool gutters and installed 8 lane rope anchors and anti-wave ropes with holders.

Columbia Heights Rec. Ctr. Playgroun
Columbia Heights Rec. Ctr. Playgroun

HRGM was the contracted for the renovation of the Columbia Heights Community Center playground. We demolished the existing play area and re-graded the land. We installed a new Storm-Water Management System and installed new permeable pavers, footers, and ADA ramps. We installed new custom play equipment for the tot-lot and school aged play areas. We installed new site furnishings and upgraded the lighting. We designed a new splash pad, installed artificial turf and striped the sports areas.

Southwest Playground
Southwest Playground

HRGM was contracted Design -Build services for the Southwest Playground. We regraded the site and installed a new retaining wall and Storm-Water Management System. There was extensive tree work and restoration, poured in place rubber installation and installation of the play equipment. We also installed a site furnishings, signs, and new light poles and fencing.

Lafayette Playground
Lafayette Playground

HRGM was contracted to re-design and renovate Lafayette's 2.5 acre park. There was demolition of the existing site and significant regrading. Resurfacing of sports courts. We installed Bioretention and Storm-Water Management systems. We installed new custom designed play features and a splash pad that is sensor activated and connected to a greywater recycling system. We installed 17,500 SF of sod and 4,100 plants all installed in the winter months.